irrgular shaped 2 apns, considered 1 legal parcel buildable, zoning had carry over from BLM open space . . . but not the surronding or general plan, allows residential, manufactured homes, agricultural with permit. survey map listed directions lines springs info. cleared faster leach perc test, cheaper septic, 2 springs, + adj south line hit 20gpm well at 250ft, water connection actually costs more, elect on East and South line take left Benson, 1/3 mile, left Iola, 1/2 mile gate, head right at rock retaining side, next gate line, circle middle, cleared area to lines, 150 south of drainage. Best spring, 75 ft south of drainage creek - creek runs 7-10 months of year
Information is believed to be accurate but should not be relied upon without verification.
Data Provided by Shasta MLS
Last updated: 2023-12-26T18:54:22.000-08:00. Privacy Policy